Building Inspection Department
Additions
ADDITION GUIDELINES
Items needed:
- Town of Greenville Application for Building Permit
- Proper Fees--$175.00 and $100.00 deposit
- Site Plan to include:
- Setbacks to property lines – based on parcel zoning and building size
- Distances to other structures
- Location of septic system – if applicable
- Location of well – if applicable
- Drainage easements
- Utility easements
- Addition detail
- Type of material
- Floor plan & front elevation – blueprints or hand drawn sketch
- Material sizes
- Footings / foundation
Items for Consideration:
- Drainage easements
- Utility easements
- Shoreland Zoning
- Airport Zoning
- Wetlands
- Property lines
- Diggers Hotline (1-800-242-8511)
- Electrical needs
- Heating needs
BEFORE building anything you must first check the shoreland, wetland and airport zoning.
This can be done on the Outagamie County website www.co.outagamie.wi.us
Outagamie County Zoning Department
www.co.outagamie.wi.us/zoning/zone-home.html