Sheds & Detached Structures


bid-sheds1

SHED GUIDELINES
Items needed:

  • Town of Greenville Application for Building Permit
  • Proper Fees — Dependant on size of shed $50.00 / $100.00 / $150.00/ $250.00
  • Site Plan to include:
    • Setbacks to property lines – based on parcel zoning and building size
    • Distances to other structures
    • Location of septic system – if applicable
    • Location of well – if applicable
    • Drainage easements
    • Utility easements
  • Shed detail:
    • Type of material
    • Floor plan & front elevation – blueprints or hand drawn sketch
    • Material sizes
    • Footings / foundation


Items for Consideration:
bid-sheds2

  1. Drainage easements
  2. Utility easements
  3. Shoreland Zoning
  4. Airport Zoning
  5. Wetlands
  6. Property lines
  7. Diggers Hotline (1-800-242-8511)
  8. Plan ahead for future (fences, additions, etc.)
  9. Electrical needs
  10. Heating needs – unvented gas heating systems and/or wood burning systems not allowed 

Garage Plan Sample
Site Plan Sample

BEFORE building anything you must first check the shoreland, wetland and airport zoning.

This information is found on the  "GIS & Maps" tab on the Outagamie County website www.outagamie.org
and the Outagamie County Zoning Department www.outagamie.org/government