1 & 2 Family Homes
CONSTRUCTION OF NEW HOME ONLY!
WI UDC Codes
- Cross Section Sample
- Drainage Plan Example
- If there is No Drainage Plan for the lot, the house has Exposed Windows or a Walk-out Basement
- Site plan Sample
- Erosion Control
- Cautionary Statement to Owners
- Required Inspections
- Driveway Installation
Drain Tile — Please be aware that in many of our subdivisions there may be an existing drain tile system. These drain tile systems have been used by farmers in the past to drain their fields. If there is field tile and you damage or disconnect it during basement excavation, it must be reconnected in a hydraulically efficient fashion as soon as possible. If these tiles are not reconnected, water damage could occur to new construction for which you may be held liable.
Curb Valve Boxes — It is the responsibility of the property owner to protect the water service curb valve. If the water utility finds the calve box damaged, we will not turn the water on to the property until the box is repaired or replaced.
BEFORE building anything you must first check the shoreland, wetland and airport zoning.
This information is found on the "GIS & Maps" tab on the Outagamie County website www.outagamie.org
and the Outagamie County Zoning Department www.outagamie.org/government